Monitoring of constructed wetland for groundwater remediation

About this project

Client
Hasbro, Inc.
Location
Minnesota
Completion date
2004 (performance monitoring); ongoing (compliance monitoring)

A slow-moving plume of chlorinated solvents extends from a former manufacturing facility northward to a channel connected to Lake Minnetonka in the western Twin Cities area. This plume had been in the subsurface for many years and was being slowly degraded into environmentally safe compounds by natural processes, but the Minnesota Pollution Control Agency (MPCA) was concerned that even a small flow could affect the surface water.

Because a pump-and-treat system would be resource-intensive and alter existing mechanisms, Barr designed a constructed wetland that enhances the already occurring natural attenuation and developed a plan that generated public and MPCA support. Our design included a barrier to passively control and direct groundwater flow through the reconstructed wetland, where mechanisms bio-stimulate the attenuation process.

To address the MPCA’s requirement of four years of wetland performance monitoring to evaluate the effectiveness of the wetland treatment system’s operation and maintenance, Barr developed an innovative performance monitoring program. This included maintaining the wetland’s operation by promoting growth of desired plant species and monitoring the wetland hydraulics, chemicals of concern, wetland geochemistry, and surface water immediately downgradient of the wetland. After four years of performance monitoring, the data showed the wetland operates as designed and provides a permanent, successful, low-cost treatment system while also serving as a park area for the community.

Key team members

Jamie Bankston
Vice President
Senior Environmental Engineer
Brad Schwie
Senior Geological Engineer
Don Richard
Vice President
Senior Civil Engineer
Joe Berns
Vice President
Senior Engineer

Related Contaminated site management projects