Environmental support for post-fire cleanup at industrial facility

About this project

client
Confidential
location
Wisconsin
completion date
2018

After a fire at a large industrial facility, Barr was hired to provide emergency response services and longer-term environmental monitoring activities. One of the primary concerns was addressing contamination of per- and polyfluoroalkyl substances (PFAS), contained in fire-fighting foams, in stormwater and fire-water ponds. We also provided general environmental compliance support during site cleanup and reconstruction activities. Barr conducted sampling and observation activities associated with PFAS-impacted water and potential stormwater runoff, collecting samples in accordance with industry best practices to prevent cross-contamination. We also inspected off-site surface-water bodies, from stream banks and by boat, for evidence of fire-related contamination. In addition, Barr worked with our client and the state environmental agency to determine treatment objectives and permit a system for removing PFAS compounds from water before it was discharged. We assisted with the design, permitting, and installation of a system that used granular activated carbon and ion exchange to remove PFAS. Once the system was operational, we conducted routine treatment-system sampling activities and tracked operational effectiveness. Finally, we helped identify regulatory requirements triggered by the event; prepared incident follow-up reports; assisted with waste management and disposal; and provided contractor oversight.

 

(Photo above is a stock image) 

Key team members

Karma Hughes

Vice President
Senior Geologist

Katie Wolohan

Senior Environmental Engineer

Erik Boleman

Vice President
Senior Chemical Engineer

Andy McCabe

Environmental Engineer

Related Other Sectors projects

Park and landscape design for Mouse River enhanced flood protection project
Design of abutment wall extension at Dells hydro station
Coffee Creek trout stream restoration
Dry-stack tailings management
Tailings basin expansion and closure options
Investigation and remediation of jet-fuel release
Vapor intrusion investigation and mitigation in a residential neighborhood
Snowpack monitoring and lake drawdown for Minnesota watershed district
Penn Avenue sinkhole investigation and rehabilitation
Engineering and design for Universal Studios’ rapids ride
Landslide stabilization design for an underground coal mine
Advanced oxidation process pilot evaluation for municipal drinking-water system
Stormwater treatment wetland for Minnesota college arboretum
EMIS implementation and related assistance
RICE applicability analysis and audit
Sustainable landscape master plan for Minnesota college campus
Responding to wind-farm tornado damage
Evaluation of wind-turbine foundation following fire damage
Groundwater modeling for wellhead-protection-plan amendment
Multi-site PFAS remedial investigation and remediation
Sediment removal from beneath Vermillion River bridge
Monitoring of end-pit lake at oil sands mine
Flood risk reduction of suburban lakes
Letter of map revision for Minnesota city
Options study and design to restore biomass fuel-handling system
Mine remediation and reclamation
Fish-habitat and floodplain restoration of a Minnesota trout stream
West River Parkway landslide repair
Self-contained bog built on college roof
FERC relicensing of Ford Lake Dam
Groundwater compliance assistance for CCR Rule
Natural channel design for aquatic organism passage
Engineering and design for SeaWorld’s Infinity Falls water ride
Floodproofing of utility switchyard
Structural monitoring of sanitary sewer line
Flood mitigation at refinery
Wetland replacement assistance for highway project
Lilydale Regional Park stormwater management and slope stabilization
PFOS investigation at municipal wastewater plant
Landscape master plan for Minnesota college campus
Response to denatured ethanol release
Aquatic invasive species (AIS) management in a Wisconsin lake
Solar-energy-system compliance
Berm-failure study at saltwater disposal well site
Preliminary feasibility study for PFAS-related water quality concerns
Rockford dam removal
Groundwater modeling and remedial improvements at closed landfills
Stressor-identification report for an impaired urban stream
Post-flood stream assessment and natural channel design
Redevelopment of former Mayflower Mine
Water-quality and structural monitoring for channel dredging
Spillway redesign at Cedar Falls Hydro Generating Station
Flood risk management system upgrades and FEMA certification
PMF modifications at hydroelectric plants
PMF study for the Dead River
PFAS mass balance and sample collection
PFAS treatment during power plant decommissioning
TMDL study and water quality assessment for a suburban stream
Gas processing equipment, outage procedure and fitness-for-service evaluation
PFAS stack testing services for a manufacturing client
AWIA risk and emergency compliance for urban drinking water
Environmental assessment program for highway safety improvements
CFD modeling of stormwater tunnels
Environmental services at manufacturing facility
Design of repairs to leaking reservoir
Trichloroethylene (TCE) investigation and remediation
RCRA waste tank inspection, certification, and closure
Air permitting assistance for reaction-injection molding operation
Road raise and conceptual design
Reasonably available control technology analysis for refinery
Flood-control-system upgrades and certification
Landslide stabilization protects architectural treasures
Strategy for collecting lake-morphometry data
Tailings facility dam safety review
Wastewater antidegradation analysis and NPDES permit renewal
Comprehensive water audits at manufacturing facilities
Environmental analysis for transmission line
Environmental planning and permitting for solar-generation and battery-storage project